Saturday, August 12, 2023

Interior insulation and electrical!

Painting their future vanity (SW "Wisteria")

Joining the porch storeroom...

Passed our 4-way inspection this week: framing, electrical, plumbing, and HVAC ducts

Then came the closed-cell foam insulation--estimated R-36 in walls and R-72 in the ceiling!  This is in addition to 3" of rigid foam insulation everywhere on the outside, which will add at least R-10.


Doors to patio and back yard.  All exterior doors are in!

Half bath mostly insulated...

Garage insulations: foam (for house envelope), "some kind of fiber" for walls, and rockwool for ceiling

Rose enjoying the deck!

 

Sunday, July 23, 2023

Windows

 



Living and dining room windows

Sadly, they do obscure the view a bit!


Lighting cans and a new window

Front windows all installed

Next steps: roofing underlayment (also electrical work)

Saturday, July 15, 2023

That's a wrap!

Fully installed downstairs bath/shower surround


Kids' installed pink tub!

Trying out the kids' vanity (on our porch)

Measuring for roofing material!


Nice big windows (and doors) are in the garage and ready to install!

Moisture barrier



Sunday, July 9, 2023

Building a deck

 

Here's a boring tub installed in the downstairs bathroom.

And here's the much cooler tub that will be in the kids' bathroom!

Beginnings of a deck! (Concrete patio, support beams)


Watching fireworks on July 4 from atop the garage


That big beam is apparently about 800 lbs!

Checking out the loft/storage space we added to the plans

The view out over the framed deck!

Nice deck!

Monday, June 26, 2023

A visit from the Terre Hautians!

 We had a lovely time with family from Terre Haute!

There was much playing with our foster kittens...

Reading at bedtime

First, verdant, hike: Temple Fork

The tough girls!

June has been so cool and even sometimes rainy!

One of several plays to which we were "treated"

Second hike: Willow Creek Loop. So many mule's ears and arrowleaf balsamroot (flowers)!

Kids, flowers, Mt. Elmer



There was much picking of haskap and strawberries

Appreciating the view from Miriam's future bedroom window

A few quick house update photos! The framing is basically done!

The back—with as few windows as possible


The front—with as many windows as possible

Ductwork has been going in

Getting ready to pour a front patio

Monday, June 12, 2023

Beginnings of a Roof

The house is feeling more enclosed--just the center upstairs is still open.  

View from bedroom through closet into office

View from back kid room through closets to front kid room

Back wall of kitchen is also framed, creating our back entry to the right  

We took a short camping trip to Dinosaur National Monument with another family--our first of the season!

Rose completing her Junior Ranger booklet in front of the exposed bone fossil wall

Hike at Dinosaur National Monument (high above the Green River)

Tim in front of Mt. Logan on M+R's last day of day camp