Friday, October 27, 2023

Certificate of Occupancy!

 

Wood floor going in

Upstairs wood floor, fan, and view

View from Miriam's room

Downstairs full bath

Deck railing and fresh snow!

Geothermal heat pump and water heater (just doing electric heat until the wells are done)

Workers have been working late

It's maybe blacker than we imagined, but still looks good

The tea station and wall cabinets!

Our bathroom's linoleum counter, in process

The sun already hits the back wall of the office!


Kitchen countertops!

Geothermal well digger has been here 4 days and operated only 1...

The digging truck's old-school control panel

The drill bit for drilling the wells

Solar panels being installed

Beautiful railings reclaimed from old house's deck wood

Bricks reclaimed from old house and cut in half, waiting to be installed

Getting ready to rip up the old driveway

Old driveway gone, brick work underway behind tarps

Kid bathroom complete

Deck railing

Deck railing cables... and fresh snow

Stairs railing (reclaimed wood in railing and newell post)

Bricks in progress

S+T bath, complete!

We have a CERTIFICATE OF OCCUPANCY!


Saturday, October 14, 2023

Siding is complete, floors are started

Front and side yaki sugi

Back yaki sugi

Linoleum "rug" in the dining room

Kitchen floor

Nice blue in the bathroom

Pot/can lights installed

Front door painted

Watching the annular eclipse!

Saturday, October 7, 2023

Deck and Siding

Rear of house with rigid foam insulation and siding support boards

Yaki sugi siding!  It's a heat-treated cedar with a dark grey oil that will weather over time (wabi sabi).  And it smells amazing!



Tim and Rose admiring the view from the deck!

First view of the mostly finished deck (awaiting a railing)





Engineered red oak flooring waiting for installation next week!










Friday, September 29, 2023

Decking, Templating, and Prepping for Exterior!

Kids "getting ready" after their vanity was templated!

Can you tell which wood is added by the builder to fill out the back of our peninsula?



Three rows of decking!!!

The OSB in the downstairs center is for holding the bricks! 

Rigid insulation and siding support boards are complete on downstairs





 

Friday, September 22, 2023

Cabinets



So exciting to see those kitchen cabinets go in!

Behold: the Tea Station!

The peninsula from the dining room side

Downstairs full bath vanity

Kids' bath vanity


Parents' bath vanity
All interior doors and trim installed!

Installing the metal "standing seam" roof

If you look closely at the high roof, you can see the standing seams

...now, just to hope the rest can get done on time!

Quick edit to add:

There is now snow at the top of Logan Peak, in addition to some color in the trees!

Saturday, September 16, 2023

Things are moving!

 

We had to restack all our salvaged wood from the old deck...


...so that a new underground electric line could be trenched to the house.

Parents' closets (others are done too)

Windows with sills and trim (Rose's room)

Today, we rented a UHaul to move 30+ cabinets and trim out of our garage and basement!

Delivering to the new house garage

What an empty garage!

New garage: the result of 4 trips in the moving truck

Enjoying the deck