Wednesday, April 12, 2023

Progress!!

 Not a lot has been happening with our new house, due in large part to this:

Note how far above "max" we are...

After the house itself moved in October--on USU's Homecoming weekend, ironically enough--the crawlspace, garage, and back addition remained.  Some of the brick walls remained remarkably intact.

Back wall of old house, with house structure visible in rightmost "window" (Oct. 5)

Those sturdy wooden beams (bottom right) and the skid steer (top left) and some jacks (not pictured) were the main tools the house mover used to get the house off of the foundation.  It was an amazing process, and we will definitely follow up when that old house has a new lot.


Garage and addition collapsing (Jan. 12)


Garage and addition demolition (Jan. 17)

Excavation and leveling for footings (Jan. 20)


Footings with insulating blankets (Jan. 21)


Foundation walls (Jan. 24)


Cement curing under thermal blankets (Jan. 26)




Continuing to cure (Feb. 2)


Gravel around foundation and under slab (Mar. 2)



Radon mitigation (black), plumbing stubs (white), and geothermal stubs (not shown) (Mar. 28)

Raking yet more gravel (Mar. 29)

Miri by even more gravel and rigid styrofoam insulation (Ap. 1)


Newly poured cement pad (Ap. 11)


Cement pad curing (Ap. 12)