Friday, May 26, 2023

Exterior walls

 

Outside framing basically complete



The back looks a little like a castle!




Celebrating the last day of school on the cowch at Aggie Ice Cream!

Saturday, May 20, 2023

Second floor!


The kids "sleeping" in their future rooms

Selfie from our office


Front view at the end of the week, kids at front door for scale


View as you emerge from the stairs to the second floor

Logan Peak from our bedroom window


Saturday, May 13, 2023

Stairs!

 

The downstairs interior is feeling complete!

They spelled "farmer" wrong!

Beautiful stairs!

Not-so-beautiful backyard, with new cherry tree... from upstairs

The view from upstairs

M's birthday party!

Saturday, May 6, 2023

Sheathing on ground level, a garage floor, and a floor for upstairs!

Sheathing complete and a freshly cured garage floor

Future stairwell

Living room "window"

To Do list

Epic, 500lb support beam for garage deck not quite in place
Facebook Marketplace ad for our old house!

Saturday, April 29, 2023

First floor framed!

Sheathing started going up at the beginning of the week!

6 feet of doorway to the backyard, for easy access! (We'll clean it up later...)

Our first second-floor joists!

Best view from a garage in Logan?

Kids "eating" at the "dinner table" left by the workers (roughly where the dining room table will be)

Saturday, April 22, 2023

Framing begins!

Our last post spanned October through April. This post sure feels like things are speeding up—because all that we're putting up here happened within the past week!

Here's where we left off last time.

Some framing materials showed up!


On Wednesday a "wall" was laying on the pad!


Thursday, the walls started going up.

By the end of the day, there were multiple sections.


Saturday morning: all first floor exterior walls except the back and garage!

The view out the living room window.

House pose!

Looking from the garage at the kids playing house.

The neighbor ripped down their collapsed garage and happens to be doing some framing too...

Wednesday, April 12, 2023

Progress!!

 Not a lot has been happening with our new house, due in large part to this:

Note how far above "max" we are...

After the house itself moved in October--on USU's Homecoming weekend, ironically enough--the crawlspace, garage, and back addition remained.  Some of the brick walls remained remarkably intact.

Back wall of old house, with house structure visible in rightmost "window" (Oct. 5)

Those sturdy wooden beams (bottom right) and the skid steer (top left) and some jacks (not pictured) were the main tools the house mover used to get the house off of the foundation.  It was an amazing process, and we will definitely follow up when that old house has a new lot.


Garage and addition collapsing (Jan. 12)


Garage and addition demolition (Jan. 17)

Excavation and leveling for footings (Jan. 20)


Footings with insulating blankets (Jan. 21)


Foundation walls (Jan. 24)


Cement curing under thermal blankets (Jan. 26)




Continuing to cure (Feb. 2)


Gravel around foundation and under slab (Mar. 2)



Radon mitigation (black), plumbing stubs (white), and geothermal stubs (not shown) (Mar. 28)

Raking yet more gravel (Mar. 29)

Miri by even more gravel and rigid styrofoam insulation (Ap. 1)


Newly poured cement pad (Ap. 11)


Cement pad curing (Ap. 12)